Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/93878Export to Endnote
| Title: | Second Annual Technical Report EL 30785 15 March 2017 to 14 March 2018 |
| Title Holder / Company: | Finnis Contracting |
| Report id: | CR2018-0152 |
| Tenure: | EL30785 |
| Year: | 2018 |
| Abstract: | This is the second technical report for EL 30785 carried out from March 2017 to March 2018. Activities included; Ground reconnaissance to verify supposed ore body formations, noted on the aerial survey; Ground survey to attempt visible identification of the size of the ore body, with a view to the drilling programme; Collection of chip and grab samples; Aerial reconnaissance; and Mapping of proposed Drill sites. |
| Date Added: | 8-Jul-2025 |
| Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
| File | Size | Format | Add to Download |
|---|---|---|---|
| EL30785_2018_A_03_SurfaceGeochem.txt | 9.61 kB | Text | Add |
| EL30785_2018_A_02_Sample_Map.pdf | 488.83 kB | Add | |
| EL30785_2018_A_05_ATTACHMEN2_Proposed_drill_lines.pdf | 419.54 kB | Add | |
| EL30785_2018_A_06_ATTACHMENT3_Drill_Proposal.pdf | 66.11 kB | Add | |
| EL30785_2018_A_01.pdf | 515.96 kB | Add | |
| CR2018-0152_EL30785_2018_A_04_ATTACHMENT1_Sample_results_.pdf | 5.59 MB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.