Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/93878
Export to Endnote
Title: Second Annual Technical Report EL 30785 15 March 2017 to 14 March 2018
Title Holder / Company: Finnis Contracting
Report id: CR2018-0152
Tenure: EL30785
Year: 2018
Abstract: This is the second technical report for EL 30785 carried out from March 2017 to March 2018. Activities included; Ground reconnaissance to verify supposed ore body formations, noted on the aerial survey; Ground survey to attempt visible identification of the size of the ore body, with a view to the drilling programme; Collection of chip and grab samples; Aerial reconnaissance; and Mapping of proposed Drill sites.
Date Added: 8-Jul-2025
Appears in Collections:Minerals Exploration Reports (MEX)



Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader