Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/93380
Export to Endnote
Title: Annual Report For the Period 11 August 2016 to 10 August 2017 EL 30226 Dhupuma Plateau
Title Holder / Company: Gulkula Mining Company
Report id: CR2017-0344
Tenure: EL30226
Year: 2017
Author: Cameron, J
Annandale, M
Abstract: During the reporting period no bauxite drilling programs were implemented, the exploration works focussed on studies to advance the Mine Management Plan (MMP) requirements for the mining permitting of the Dhupuma Bauxite project. The primary purpose of an MMP is to formalise the actions to be taken and strategies to be implemented, that combined, will manage impacts to the environment to acceptable and sustainable limits over both the short and long-term. In the reporting period this work included flora and fauna and hydrology and hydrogeology surveys, a Naturally Occurring Radioactive Materials (NORM) study and establishment of both a surface water monitoring program and groundwater monitoring bore drilling and installation program.
Date Added: 8-Nov-2024
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL30226_2017_A_01.pdf2.51 MBPDF Add
EL30226_2017_A_02_Appendix2.pdf8.48 MBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader