Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/94548Export to Endnote
| Title: | Third Annual Technical Report EL 30785, 15 March 2018 to 14 March 2019 |
| Title Holder / Company: | Finnis Contracting |
| Report id: | CR2019-0135 |
| Tenure: | EL30785 |
| Year: | 2019 |
| Abstract: | This is the third technical report for EL 30785 carried out from March 2018 to March 2019. Activities included: Ground reconnaissance to verify supposed ore body formations, noted on the aerial survey and from historical data. Ground survey to attempt visible identification of the size of the ore body, with a view to the drilling program intended in 2019. Collection of chip and grab samples and assaying. Aerial reconnaissance. Further mapping of proposed Drill sites. Source and fit out drill rig. Ongoing compilation of information/data for Mine Management Plan. Compile AAPA certification application. Meeting with Denise Turnbull and her staff to try and resolve access issues. Ongoing negotiations with stakeholders to gain access to proposed drill sites. |
| Date Added: | 22-Mar-2026 |
| Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
| File | Size | Format | Add to Download |
|---|---|---|---|
| EL30785_2019_A_01.pdf | 680.66 kB | Add | |
| EL30785_2019_A_02_2019_Sample_Locations.pdf | 325.6 kB | Add | |
| EL30785_2019_A_03_SurfaceGeochem.txt | 8 kB | Text | Add |
| EL30785_2019_A_04_Sample_Analysis.pdf | 116.6 kB | Add | |
| EL30785_2019_A_05_Proposed_Drilling.pdf | 198.02 kB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.