Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/94548
Export to Endnote
Title: Third Annual Technical Report EL 30785, 15 March 2018 to 14 March 2019
Title Holder / Company: Finnis Contracting
Report id: CR2019-0135
Tenure: EL30785
Year: 2019
Abstract: This is the third technical report for EL 30785 carried out from March 2018 to March 2019. Activities included: Ground reconnaissance to verify supposed ore body formations, noted on the aerial survey and from historical data. Ground survey to attempt visible identification of the size of the ore body, with a view to the drilling program intended in 2019. Collection of chip and grab samples and assaying. Aerial reconnaissance. Further mapping of proposed Drill sites. Source and fit out drill rig. Ongoing compilation of information/data for Mine Management Plan. Compile AAPA certification application. Meeting with Denise Turnbull and her staff to try and resolve access issues. Ongoing negotiations with stakeholders to gain access to proposed drill sites.
Date Added: 22-Mar-2026
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL30785_2019_A_01.pdf680.66 kBPDF Add
EL30785_2019_A_02_2019_Sample_Locations.pdf325.6 kBPDF Add
EL30785_2019_A_03_SurfaceGeochem.txt8 kBText Add
EL30785_2019_A_04_Sample_Analysis.pdf116.6 kBPDF Add
EL30785_2019_A_05_Proposed_Drilling.pdf198.02 kBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader