Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/94078Export to Endnote
| Title: | Yaroo Creek 2D Seismic Survey Processing Report |
| Title Holder / Company: | Sweetpea Corporation Tamboran Resources |
| Report id: | PR2023-G013 |
| Tenure: | EP136 |
| Year: | 2023 |
| Corporate Author: | RealTimeSeismic (RTS) |
| Abstract: | Tamboran Resources contracted 'realtimeseismic' to process the 7 seismic lines acquired under the Yaroo Creek 2D seismic survey in July 2022. The objective of the processing was to obtain high-quality structural imaging and fault definition for shale gas exploration. The data processing which took place between 01/08/2022 and 23/12/2022, produced PSTM and PSDM sections and provided good confidence in fault and structural imaging, which is important in field development and placment of future appraisal and development wells. |
| NOTE: | Processing data (86GB) available on request. A hard drive must be supplied for requests over 50GB. |
| Document Type: | Seismic Acquisition |
| Date Added: | 27-Jul-2025 |
| Appears in Collections: | Petroleum Geophysical Surveys (PEX Geophysics) |
Files in this Report:
| File | Size | Format | Add to Download |
|---|---|---|---|
| PR2023-G013_Yaroo_Creek_2D_Seissmic_Survey_2022_-_Processing_Report.pdf | 21.03 MB | Add | |
| ReadMe.txt | 44 B | Text | Add |
| PR2023-G013_SP_CDP_Relations.zip | 67.3 kB | ZIP | Add |
| PR2023-G013_Stacking_and_Migration_Velocities.zip | 42.3 MB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.