Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/94078
Export to Endnote
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.date.accessioned | 2025-07-27T22:44:06Z | - |
dc.date.issued | 2023 | - |
dc.identifier.govdoc | PR2023-G013 | - |
dc.identifier.uri | https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/94078 | - |
dc.description.abstract | Tamboran Resources contracted 'realtimeseismic' to process the 7 seismic lines acquired under the Yaroo Creek 2D seismic survey in July 2022. | - |
dc.description.abstract | The objective of the processing was to obtain high-quality structural imaging and fault definition for shale gas exploration. | - |
dc.description.abstract | The data processing which took place between 01/08/2022 and 23/12/2022, produced PSTM and PSDM sections and provided good confidence in fault and structural imaging, which is important in field development and placment of future appraisal and development wells. | - |
dc.subject.classification | Processed seismic lines | - |
dc.subject.classification | Processing data | - |
dc.subject.classification | Processing information | - |
dc.subject.classification | Statics corrections | - |
dc.subject.classification | Velocity analysis | - |
dc.title | Yaroo Creek 2D Seismic Survey Processing Report | - |
dc.type | Seismic Acquisition | - |
dc.relation.isatgeolprovince | McArthur Basin | - |
dc.relation.isatgeolprovince | Beetaloo Sub-basin | - |
dc.identifier.tenure | EP136 | - |
dc.description.publicnotes | Processing data (86GB) available on request. A hard drive must be supplied for requests over 50GB. | - |
dc.contributor.corpauthor | RealTimeSeismic (RTS) | - |
dc.contributor.holder | Sweetpea Corporation | - |
dc.contributor.holder | Tamboran Resources | - |
dc.identifier.collectionname | Petroleum Geophysical Surveys (PEX Geophysics) | |
dc.identifier.govdocprefix | PR2023 | |
dc.identifier.surveyname | Yaroo Creek 2D SS 2022 | - |
dc.identifier.surveyline | YC22_06 | - |
dc.identifier.surveyline | YC22_07 | - |
dc.identifier.surveyline | YC22_08 | - |
dc.identifier.surveyline | YC22_09 | - |
dc.identifier.surveyline | YC22_10 | - |
dc.identifier.surveyline | YC22_11 | - |
dc.identifier.surveyline | YC22_12 | - |
local.flag.notified | 1 | en |
Appears in Collections: | Petroleum Geophysical Surveys (PEX Geophysics) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
PR2023-G013_Yaroo_Creek_2D_Seissmic_Survey_2022_-_Processing_Report.pdf | 21.03 MB | Add | |
ReadMe.txt | 44 B | Text | Add |
PR2023-G013_SP_CDP_Relations.zip | 67.3 kB | ZIP | Add |
PR2023-G013_Stacking_and_Migration_Velocities.zip | 42.3 MB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.