Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/93987
Export to Endnote
Title: EL 31475 Douglas Project Annual Report for the period 1 September 2017 to 31 August 2018
Title Holder / Company: CopperOz
Report id: CR2018-0354
Tenure: EL31475
Year: 2018
Abstract: EL 31475 (Project) is located approximately 135 km NW of Katherine and 600 km W of Pine Creek. The Project is located on the western margin of the Pine Creek Orogen. It includes the Quantum REE prospect which is located under Daly Basin sedimentary rocks. CopperOz Pty Ltd is assessing the potential of the application area for bedrock REE, U and Au-Ag deposits, as well as alluvial Au deposits. Previous exploration in the Project revealed elevated U, REE, Au, Ag and base metal values. Drilling located zones of REE mineralisation over a strike length of 400m. Total Rare Earth Oxide (TREO) grades of up to 11% were recorded. Notable drill intersections included 12m at 4.51% TREO (TDD8) and 9.2m at 3.78% TREO within a broader zone of 21.9m at 2.55% TREO (TDD10). During the reporting period, CopperOz Pty Ltd compiled and assessed all available geological, geophysical, remote sensing and exploration work undertaken over the Project area. No ground based exploration was undertaken. Work on the Project is at a preliminary stage. The potential for the Project area to contain significant REE, U and Au-Ag mineralisation appears to be good.
Date Added: 21-Jul-2025
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL31475_2018_A.pdf1.81 MBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader