Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/93885
Export to Endnote
Title: | ML 30182 Jervois Project Annual Report for the reporting period 26 March 2017 to 25 March 2018 |
Title Holder / Company: | Jinka Minerals Kentor Minerals (NT) |
Report id: | CR2018-0164 |
Tenure: | ML30182 |
Year: | 2018 |
Author: | Lennartz, R |
Abstract: | There was extensive mineral exploration undertaken within ML 30182, during the reporting period. The majority of the work undertaken on ML 30182 has been reported in: EL 25429 - Jervois Project Annual Report for the reporting period 2 February 2017 to 1 February 2018. A total of 20 holes were drilled on ML 30182 for 9,051.24 metres. The drill hole program can be summarized as: 5 RC drill holes for a total of 426.2 metres; 15 RC pre-collared holes for 2,476.69 metres and with Diamond tails for 6,148.35 metres. |
Date Added: | 8-Jul-2025 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
ML30182_2018_A.pdf | 2.65 MB | Add | |
CR2018-0164_Appendix_1.zip | 2.53 MB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.