Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/93485
Export to Endnote
Title: Annual Report Year 20 MLN 1154 Merlin Diamond Project Annual report for the period 1 January 2017 to 31 December 2017
Title Holder / Company: Merlin Operations
Merlin Diamonds
Report id: CR2017-0657
Tenure: MLN1154
Year: 2018
Author: Rockett, GMI
Abstract: During the reporting period, exploration focus has been on testing targets selected from the company's extensive historical database comprising airborne and ground geophysical, soil geochemical, and indicator mineral datasets. Forty-two priority targets were selected for drill testing, and high-resolution ground EM surveys were undertaken over six to assist with resolving the target prior to finalising drill collar locations. The exploration Mining Management Plan for the 2017 Merlin drill program was compiled by enviroMINDed and submitted in April. The program was approved by the DPIR in May, with Authorisation Number 0736-01, providing permission for Merlin to commence work. Drilling commenced on 11th July, and was completed on 21st August, with a total of 155 holes drilled for 2,871 metres. No kimberlite pipes were intersected during the program, although the presence of a narrow kimberlite fissure between Kay and Bedevere was confirmed. In mid September, all necessary rehabilitation work was undertaken at each drill target prior to the commencement of the wet season.
Date Added: 11-Nov-2024
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
MDL_LithCodes.pdf173.6 kBPDF Add
MLN1154_2017_A.pdf1.44 MBPDF Add
MLN1154_2017_A_FileListing.pdf8.7 kBPDF Add
MLN1154_2017_A_FileListing.txt1.75 kBText Add
CR2017-0657_Appendices.zip5.87 MBZIP Add
CR2017-0657_Geophysics.zip7.37 kBZIP Add
CR2017-0657_Maps.zip9.16 MBZIP Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader