Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/90553
Export to Endnote
Title: EL 25429 Jervois Project Annual Report for the reporting period 2 February 2013 to 1 February 2014
Title Holder / Company: Jinka Minerals
Kentor Minerals (NT)
Report id: CR2014-0015
Tenure: EL25429
Year: 2014
Author: Lennartz, R
Abstract: Although most of the drilling activities were undertaken on the ML's and MC's on the Jervois Project area, there was significant drilling undertaken on EL 25429 adjacent to the ML's and MC's. Twenty three holes were drilled on EL 25429 and these included both Diamond and Reverse Circulation holes. This phase of drilling enabled a good exposure of core to log most geological and structural parameters which can be used at a later stage for interpretation purposes. Holes were primarily designed to infill areas of the current resource model that required additional information to confirm, expand and increase the confidence in the resource model. Extensive modeling is being undertaken to further define the mineralised zone.
Date Added: 20-Aug-2020
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL25429_2014_A.pdf3.73 MBPDF Add
CR2014-0015_Appendix1.zip239.27 kBZIP Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader