Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/89251
Export to Endnote
Title: 2012 Group Technical Report GR-148/10 EL10182, EL 24524, EL 27249, 20 April 2011 to 19 April 2012
Title Holder / Company: Groote Eylandt Mining Company
Report id: CR2012-0198
Tenure: EL10182;  EL24524;  EL27249
Year: 2012
Author: Hope, D
Abstract: A change in corporate direction by BHP Billiton resulted in the withdrawal from exploration activities in the region by MinEx in early 2011. Consequently no field exploration activities were conducted during the reporting period. However BHP Billiton management also recognised the synergy with the existing GEMCO Manganese Mine on Groote Eylandt, and during January 2012, management of the East Arnhem Project was transferred to BHP Billiton GEMCO. This will enable the local operation to continue exploration for a manganese mineralisation in the region and fulfil the existing lease arrangements.
Date Added: 4-Sep-2019
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
GR148_2012_GA.pdf1.6 MBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader