Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/88121
Export to Endnote
Title: | Annual report ELR's 46 to 55 Bigrlyi Project period ending 17 November 2010 |
Title Holder / Company: | Energy Metals |
Report id: | CR2010-0953 |
Tenure: | ERL46; ERL47; ERL48; ERL49; ERL50; ERL51; ERL52; ERL53; ERL54; ERL55 |
Year: | 2010 |
Author: | Dunbar, P |
Abstract: | Exploration undertaken in the current reporting period 18 November 2009 to 17 November 2010 included: Resource modelling and estimations, using Ordinary kriging and MIK methods; 27 RC holes for 6152m; 22 diamond holes and diamond tails for 3589m; XRF analysis of sample pulps and RC cuttings; Hychips Logging; CSIRO core logging and XRF Analysis; Preliminary Mapping and Facies logging for Sedimentary / paleoenvironmental evaluation and Ongoing rehabilitation of drill sites. |
Date Added: | 31-Dec-2018 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
CR20100953_2010_A_01.pdf | 517.54 kB | Add | |
CR2010-0953_2010_A_02_Baseline_Soil_and_Groundwater_study_Part_A.pdf | 1.74 MB | Add | |
CR2010-0953_2010_A_03_Baseline_Soil_and_Groundwater_study_Part_B.pdf | 5.76 MB | Add | |
CR2010-0953_2010_A_04_R253.2020_Bigryli_Project_Draft_compressed.pdf | 6.95 MB | Add | |
CR2010-0953_2010_A_05_Vat_Leach_May_2010.pdf | 299.97 kB | Add | |
CR2010-0953_Drillhole_Data.zip | 3.67 MB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.