Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/88097
Export to Endnote
Title: Annual Technical Report Juno Project period 1 January 2010 to 31 December 2010
Title Holder / Company: Tennant Gold
Excalibur Mining
Report id: CR2010-1135
Tenure: MLC45;  MLC46;  MLC47;  MLC68;  MLC154;  MLC155;  MCC284;  MLC578;  MLC579
Year: 2011
Author: Thomas, P
Abstract: During the reporting period Cube Consulting continued their commissioned re-evaluation of Juno resources. Cube designed RC and Diamond drilling at Juno as a part of their commission. Drilling included 55 RC holes for 10944m and 16 diamond tails for 1282m. Also completed was a DGPS survey of hole locations and downhole gyro survey. Cube Consulting completed the review and reported mid year. The report resulted in a massive downgrade in the Juno resource.
Date Added: 21-Dec-2018
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
GR017_2010_GA_01.pdf1.65 MBPDF Add
GR017_2010_GA_02_Cube_Juno_Review_201006.pdf8.31 MBPDF Add
GR017_2010_GA_03_Cube_M10_Report_june10.pdf699.48 kBPDF Add
CR2010-1135_Data.zip645.59 kBZIP Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader