Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/87514
Export to Endnote
Title: | Surprise-1 Re-Entry Well Completion Report (Interpretive) |
Title Holder / Company: | Central Petroleum |
Report id: | PR2012-0041 |
Tenure: | EP115 |
Year: | 2012 |
Corporate Author: | Central Petroleum |
Drillhole/Well Name: | Surprise 1 Re-Entry |
Rig release date: | 20/12/2011 |
NOTE: | Surprise 1 was plugged and suspended on 05/12/2010 after a mechanical problem with the rig's mast. The well was re-entered on 19/11/2011 and the original borehole evaluated. |
Document Type: | Well Completion Report |
Date Added: | 26-Jul-2018 |
Appears in Collections: | Petroleum Wells (PEX Wells) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
PR20120041_WCR.pdf | 1.45 MB | Add | |
PR2012-0041_Appendix10_Mudlog.zip | 7.67 MB | ZIP | Add |
PR2012-0041_Appendix11_RigSpec.zip | 188.22 kB | ZIP | Add |
PR2012-0041_Appendix1_DDR.zip | 2.3 MB | ZIP | Add |
PR2012-0041_Appendix2_DGR.zip | 516.61 kB | ZIP | Add |
PR2012-0041_Appendix3_CuttingDescr.zip | 112.09 kB | ZIP | Add |
PR2012-0041_Appendix4_Geochem_OtherAnalysis.zip | 3.11 MB | ZIP | Add |
PR2012-0041_Appendix5_Palynology.zip | 18.55 kB | ZIP | Add |
PR2012-0041_Appendix6_WirelineLogs.zip | 908.38 MB | ZIP | Add |
PR2012-0041_Appendix7_BitRecords.zip | 13.69 kB | ZIP | Add |
PR2012-0041_Appendix8_VSP.zip | 82.96 MB | ZIP | Add |
PR2012-0041_Appendix9_DrillingRecap.zip | 605.31 kB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.