Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/87398
Export to Endnote
Title: EL 22349 Molyhil Year 7 Annual report 17 May 2008 to 16 May 2009
Title Holder / Company: Molyhil Mining
Report id: CR2009-0487
Tenure: EL22349
Year: 2009
Abstract: Year seven exploration included 16 RC holes completed by McKay Drilling of WA for a total of 2,340m (09MHRC001-016). RC holes drilled to the north and south of the main pit area failed to identify any magnetite skarn associated with the previously identified IP anomalies. All other holes drilled in and adjacent to the existing pit intersected good widths of mineralised magnetite skarn. The existing model and the notion of two separate lodes (Southern and Yacht Club) will need to be modified when the results have been integrated into revised block model during Year 8.
Date Added: 15-Jul-2018
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL22349_2009_A_01.pdf725.53 kBPDF Add
EL22349_2009_A_02_Drill_Assay.txt131.47 kBText Add
EL22349_2009_A_03_Drill_Collar.txt4.15 kBText Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader