H0002 Version 3 H0003 Date_generated 15/07/2009 H0004 Reporting_period_end_date 16/05/2009 H0005 State NT H0100 Tenement_no/Combined_rept_no. EL 22349 H0101 Tenement_holder MOLYHIL MINING PTY LTD H0102 Project_name MOLYHIL H0106 Tenement_operator MOLYHIL MINING PTY LTD (THOR MINING PLC) H0150 250K_map_sheet_number SF 53-11 (HUCKITTA) H0151 100K_map_sheet_number 6052 (JINKA) H0152 50K_map_sheet_number H0153 25K_map_sheet_number H0200 Start_date_of_data_acquisition 17/05/2008 H0201 End_date_of_data_acquisition 16/05/2009 H0202 Data_format SL3 H0203 Number_of_data_records 16 H0204 Date_of_metadata_update 15/07/2009 H0301 location_data_file DRILL_COLLAR_DATA_EL22349_2009 H0302 lithology_data_file DRILL_LITHOLOGY_DATA_EL22349_2009 H0303 assay_data_file DRILL_ASSAY_DATA_EL22349_2009 H0304 survey_data_file DRILL_SURVEY_DATA_EL22349_2009 H0400 Drill_code RC H0401 Drill_contractor McKAY DRILLING H0402 Description Reverse Circulation Drilling H0500 Feature_located Drillhole collar H0501 Geodetic_datum GDA94 H0502 Vertical_datum AHD H0503 Projection Universal Transverse Mercator (UTM) H0508 Local_grid_name MOLYHIL H0530 Coordinate_system Projected H0531 Projection_zone 53 H0532 Location_method DGPS H0533 Surveying_company THOR MINING (HIRE OMNISTAR SUB ONE METRE) H0900 Remarks H1000 Hole ID E_Molyhil_Local N_Molyhil_Local E_GDA94 N_GDA94 RL Magnetic_Azimuth Molyhil Grid_Azimuth GDA94-AZIMUTH Dip Total_Depth Hole_Type Date Company Drill Comp Comments H1001 metres metres metres metres metres degrees degrees degrees degrees metres H1004 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 SOF 09MHRC001 10100 20240 577055.45 7483157.14 414.15 247.2 270 -60 198 RC 18/01/2009 THOR McKAY Test of Northern IP Target 09MHRC002 10150 20240 577102.69 7483171.35 413.85 247.2 270 -60 198 RC 19/01/2009 THOR McKAY Test of Northern IP Target 09MHRC003 10200 20240 577153.25 7483188.3 412.95 247.2 270 -60 192 RC 20/01/2009 THOR McKAY Test of Northern IP Target 09MHRC004 10017 19911 577074.4 7482818.03 411.95 247.2 270 -60 150 RC 21/01/2009 THOR McKAY Southern Extention Down Plunge 09MHRC005 10045 19895 577104.29 7482813.24 411.55 247.2 270 -60 168 RC 22/01/2009 THOR McKAY Southern Extention Down Plunge 09MHRC006 10072 19895 577127.8 7482817.17 411.05 247.2 270 -60 198 RC 23/01/2009 THOR McKAY Southern Extention Down Plunge 09MHRC007 10045 20008 577072.69 7482917.86 409.25 247.2 270 -60 120 RC 23/01/2009 THOR McKAY Test gap in the middle of the model 09MHRC008 10069 20010 577095.99 7482925.97 409.55 247.2 270 -60 132 RC 24/01/2009 THOR McKAY Test gap in the middle of the model 09MHRC009 10250 19600 577388.44 7482591.78 408.45 247.2 270 -60 48 RC 25/01/2009 THOR McKAY Test of Southern IP Target 09MHRC010 10315 19600 577452.15 7482611.25 408.95 247.2 270 -60 48 RC 25/01/2009 THOR McKAY Test of Southern IP Target 09MHRC011 10400 19600 577533.35 7482636.12 409.75 247.2 270 -60 132 RC 25/01/2009 THOR McKAY Test of Southern IP Target 09MHRC012 10072 20025 577093.67 7482942.89 409.95 247.2 270 -60 120 RC 26/01/2009 THOR McKAY Test gap in the middle of the model 09MHRC013 10010 19940 577059.15 7482845.13 401.45 247.2 270 -70 120 RC 26/01/2009 THOR McKAY Test gap in model 09MHRC014 10010 19965 577051.59 7482867.7 401.45 247.2 270 -70 114 RC 27/01/2009 THOR McKAY Test gap in model 09MHRC015 10050 19930 577103.5 7482848.39 411.55 247.2 270 -65 168 RC 27/01/2009 THOR McKAY Test gap in model EOF 09MHRC016 10100 19895 577160.71 7482824.43 410.75 247.2 270 -65 234 RC 29/01/2009 THOR McKAY Southern Extention Down Plunge