Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/86927
Export to Endnote
Title: Partial relinquishment report EL 28462 5 September 2011 to 9 June 2017
Title Holder / Company: May Drilling
Report id: CR2017-0371
Tenure: EL28462
Year: 2017
Author: Edgar, H
Abstract: EL 28462 is within May Drilling's Daly River Project, which comprises of Exploration Licences 28462, 29731 and 30521. EL 28462 is located approximately 105 km South of Darwin. EL 28462 originally comprised of 127 blocks. On 25 May 2013, May Drilling reduced the licence from 127 blocks to 112 blocks. Then on 9 June 2017, May Drilling reduced the licence even further to 78 blocks. May Drilling conducted numerous activities on the relinquished blocks since grant. Desktop studies were completed and helicopter reconnaissance was also conducted. It was determined that the lithology in this area of the 34 relinquished blocks is too young to host economic mineral deposits.
Date Added: 31-Jan-2018
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL28462_2017_P.pdf996.31 kBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader