Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/86529Export to Endnote
| Title: | Annual report Mt Fitch Project ERL 125 and MCN 984 for the year ending 22 August 2007 |
| Title Holder / Company: | Compass Resources |
| Report id: | CR2007-0417 |
| Tenure: | ERL125; MCN984 |
| Year: | 2007 |
| Author: | Major, T Fabray, J |
| Abstract: | A major programme of RC percussion drilling was undertaken during the period under review. This work consisted of 123 RC percussion holes totalling 10,336m of drilling plus 2 metallurgical PQ core holes for 120.2m of drilling. The aim of the programme was to follow-up on intersections from previous drilling and also to infill gaps in the drill pattern, both at the Mt. Fitch copper and the Mt Fitch uranium prospects. |
| Date Added: | 24-Oct-2017 |
| Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
| File | Size | Format | Add to Download |
|---|---|---|---|
| CR20070417_2007_GA.pdf | 115.85 kB | Add | |
| CR2007-0417_Appendices.zip | 7.38 MB | ZIP | Add |
| CR2007-0417_Figures.zip | 35.17 kB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.