Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/80300
Export to Endnote
Title: | Partial relinquishment report for period ending 19 March 2015 |
Title Holder / Company: | Minemakers Australia |
Report id: | CR2015-0245 |
Tenure: | EL29849 |
Year: | 2015 |
Author: | Pellatt, A Fulton, R |
Abstract: | The tenement was formed by the amalgamation of two tenements in early 2013. A total of 10 RC drill holes and an airborne electromagnetic survey were conducted on a pre-amalgamated tenements, with patchy or low grade phosphate mineralisation encountered. Since 19 March 2013, when EL 29849 was granted, no work has been completed. A partial relinquishment of the areas that were deemed to be peripheral to the major Wonarah phosphate depocentres was made in March 2015. |
Date Added: | 6-Aug-2015 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL29849_2015_P_01.pdf | 730.2 kB | Add | |
EL29849_2015_P_02_AirborneEM_Report.pdf | 2.86 MB | Add | |
EL29849_2015_P_03_DownholeGeochem.txt | 13.31 kB | Text | Add |
EL29849_2015_P_04_DrillCollars.txt | 2.74 kB | Text | Add |
EL29849_2015_P_05_LithUnits.txt | 5.65 kB | Text | Add |
EL29849_2015_P_06_LithCodes.txt | 5.1 kB | Text | Add |
EL29849_2015_P_07_DownholeLith.txt | 27.29 kB | Text | Add |
EL29849_2015_P_08_Downhole_Surveys.txt | 1.91 kB | Text | Add |
EL29849_2015_P_09_Magsus.txt | 11.68 kB | Text | Add |
EL29849_2015_P_10_Radeye.txt | 11.66 kB | Text | Add |
EL29849_2015_P_12_Site_Audit_Report.pdf | 1.87 MB | Add | |
EL29849_2015_P_13_File_Verification.txt | 1.57 kB | Text | Add |
CR2015-0245_EL29849_2015_P_11_AirborneEM_data.zip | 1.4 MB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.