Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/80300
Export to Endnote
Title: Partial relinquishment report for period ending 19 March 2015
Title Holder / Company: Minemakers Australia
Report id: CR2015-0245
Tenure: EL29849
Year: 2015
Author: Pellatt, A
Fulton, R
Abstract: The tenement was formed by the amalgamation of two tenements in early 2013. A total of 10 RC drill holes and an airborne electromagnetic survey were conducted on a pre-amalgamated tenements, with patchy or low grade phosphate mineralisation encountered. Since 19 March 2013, when EL 29849 was granted, no work has been completed. A partial relinquishment of the areas that were deemed to be peripheral to the major Wonarah phosphate depocentres was made in March 2015.
Date Added: 6-Aug-2015
Appears in Collections:Minerals Exploration Reports (MEX)



Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader