Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/79797
Export to Endnote
Title: | 1996 Annual report on ERL 125 Mount Fitch and MCN 984 |
Title Holder / Company: | Compass Resources |
Report id: | CR1996-0751 |
Tenure: | ERL125; MCN984 |
Year: | 1996 |
Author: | Squire, R |
Abstract: | Six RC holes (three at Area 55 and three at Mount Fitch) totalling 377m were completed, with all three holes at Mount Fitch intersecting significant copper mineralisation. Reanalysis of old diamond core at Mount Fitch, previously not analysed for base metals, identified several small zones of mineralisation. Approximately 550m of gridding was completed at Area 55 and grids were re-established at Mount Fitch to enable drilling. AMG co-ordinates and AHD levels were surveyed for RC drilling completed during the reporting year, together with several BMR-TEP, Uranerz, Compass and Billiton drill holes in the Mount Fitch area. |
Date Added: | 18-Mar-2015 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
CR19960751_Vol1.pdf | 19.33 MB | Add | |
CR19960751_Vol1_Appendix1-7.pdf | 4.04 MB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.