Please use this identifier to cite or link to this item:
                
Export to Endnote
		
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/79473Export to Endnote
| Title: | Surprise 1 Re-Entry HST1 Well Completion Report (Basic) | 
| Title Holder / Company: | Central Petroleum | 
| Report id: | PR2012-0019 | 
| Tenure: | EP115 | 
| Year: | 2012 | 
| Corporate Author: | Central Petroleum | 
| Drillhole/Well Name: | Surprise 1 Re-Entry HST1 | 
| Rig release date: | 13/01/2012 | 
| NOTE: | Surprise 1 was plugged and suspended on 05/12/2010 after a mechanical problem with the rig's mast. The well was re-entered on 19/11/2011 and the original borehole evaluated, before Surprise 1 Re-Entry was sidetracked on 21/12/2011. | 
| Document Type: | Well Completion Report | 
| Date Added: | 9-Jan-2015 | 
| Appears in Collections: | Petroleum Wells (PEX Wells) | 
Files in this Report:
| File | Size | Format | Add to  Download  | 
|---|---|---|---|
| PR20120019_WCR.pdf | 1.85 MB | Add | |
| PR2012-0019_Appendix1_DDR.zip | 1.72 MB | ZIP | Add | 
| PR2012-0019_Appendix2_DGR.zip | 169.01 kB | ZIP | Add | 
| PR2012-0019_Appendix3_CuttingDescr.zip | 517.38 kB | ZIP | Add | 
| PR2012-0019_Appendix4_MWDLogs.zip | 428.18 kB | ZIP | Add | 
| PR2012-0019_Appendix5_BitRecords.zip | 55.91 kB | ZIP | Add | 
| PR2012-0019_Appendix6_SurveyListing.zip | 57.35 kB | ZIP | Add | 
| PR2012-0019_Appendix7_DrillingRecap.zip | 108.44 kB | ZIP | Add | 
| PR2012-0019_Appendix8_Mudlogging.zip | 2.92 MB | ZIP | Add | 
| PR2012-0019_Appendix9_RigSpec.zip | 188.22 kB | ZIP | Add | 
Items in GEMIS are protected by copyright unless otherwise indicated.