Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/78977
Export to Endnote
Title: | MLN 766 and MLN 1060 Bridge Creek Project Exploration report from 1 July 1989 to 22 October 1994 |
Title Holder / Company: | Northern Gold Reynolds Northern Territory |
Report id: | CR1994-0883 |
Tenure: | MLN766; MLN1060 |
Year: | 1994 |
Author: | Cooper, WC Stokes, M Partington, GA Skeet, L Fleming, S |
Abstract: | Work during the period at Bridge Creek has outlined minor base mineralisation. The best base metal intercept was 7m at 1.4 percent Zn and 2m at 1.3 percent Pb. Gold mineralisation was defined over a width of 30m. Resource estimations being 1.5Mt at 1.9 percent g-t Au. Metallurgical test work suggests that the oxide zone only is suitable for heap leaching. |
Date Added: | 20-Nov-2014 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
CR19940883.pdf | 19.91 MB | Add | |
CR19940883_Appendix5.pdf | 4.37 MB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.