Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/78932
Export to Endnote
Title: | Annual report on the Mount Todd Project Area for the period 5 March 1993 to 4 March 1994 |
Title Holder / Company: | Zapopan |
Report id: | CR1994-0449 |
Tenure: | MLN1070; MLN1071; MLN1127 |
Year: | 1994 |
Author: | Poxon, R |
Abstract: | At Batman 31 RC holes (2461m) and 10 diamond holes incorporating 1,194m percussion precollar and 3,599m of core were completed. The diamond drilling was undertake to determine depth continuation for mineralisation. The results were encouraging and indicated a southerly plunge to the mineralisation. A RAB drill program (158 holes totalling 4,445m) was completed at the Delta Prospect. This work outlined 2 sub parallel mineralised NNE trending structures separated by some 350m, with a strike length of 600m. Follow up RC drilling proved disappointing. A new resource calculation was completed defining a total resource of 92.87Mt at 1.4g-t Au. |
Date Added: | 16-Nov-2014 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
CR19940449.pdf | 18.35 MB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.