Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/78932
Export to Endnote
Full metadata record
DC FieldValueLanguage
dc.contributor.authorPoxon, Ren_US
dc.date.accessioned2014-11-16T23:22:15Z-
dc.date.issued1994en_US
dc.identifier.govdocCR1994-0449en_US
dc.identifier.urihttps://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/78932en_US
dc.description.abstractAt Batman 31 RC holes (2461m) and 10 diamond holes incorporating 1,194m percussion precollar and 3,599m of core were completed. The diamond drilling was undertake to determine depth continuation for mineralisation. The results were encouraging and indicated a southerly plunge to the mineralisation. A RAB drill program (158 holes totalling 4,445m) was completed at the Delta Prospect. This work outlined 2 sub parallel mineralised NNE trending structures separated by some 350m, with a strike length of 600m. Follow up RC drilling proved disappointing. A new resource calculation was completed defining a total resource of 92.87Mt at 1.4g-t Au.en_US
dc.subject.classificationPrecious metalsen_US
dc.subject.classificationGolden_US
dc.subject.classificationRegional geologyen_US
dc.subject.classificationMineralisationen_US
dc.subject.classificationOre reservesen_US
dc.subject.classificationMineral resourcesen_US
dc.subject.classificationInferred mineral resourcesen_US
dc.subject.classificationIndicated mineral resourcesen_US
dc.subject.classificationMeasured mineral resourcesen_US
dc.subject.classificationDrillingen_US
dc.subject.classificationRC drillingen_US
dc.subject.classificationRAB drillingen_US
dc.subject.classificationDiamond drillingen_US
dc.subject.classificationDrill hole logsen_US
dc.subject.classificationDrill hole dataen_US
dc.subject.classificationCross sectionsen_US
dc.subject.classificationDrill core samplingen_US
dc.subject.classificationDrill cuttings samplingen_US
dc.subject.classificationAssayingen_US
dc.subject.classificationAssay valueen_US
dc.titleAnnual report on the Mount Todd Project Area for the period 5 March 1993 to 4 March 1994en_US
dc.relation.isatmap100Katherine 5369en_US
dc.relation.isatmap250Katherine SD5309en_US
dc.relation.isatgeolprovincePine Creek Orogenen_US
dc.description.stratnameBurrell Creek Formation, Phillips Creek Sandstone, Plum Tree Creek Volcanicsen_US
dc.description.drilling10 Diamond holes for 4,793 m including 1194m RC precollar (BD107 to BD116)en_US
dc.description.drilling50 RC holes for 3,386 men_US
dc.description.drilling158 RAB for 4,445 men_US
dc.description.mineprospectnameBatmanen_US
dc.description.mineprospectnameDeltaen_US
dc.description.mineprospectnameMount Todd Areaen_US
dc.identifier.tenureMLN1070en_US
dc.identifier.tenureMLN1071en_US
dc.identifier.tenureMLN1127en_US
dc.description.modifyhistory31/10/2014en_US
dc.description.modifyhistory11/05/2016en_US
dc.contributor.holderZapopanen_US
dc.identifier.collectionnameMinerals Exploration Reports (MEX)en_US
dc.identifier.govdocprefixCR1994en_US
local.flag.notified1
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
CR19940449.pdf18.35 MBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader