Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/78716
Export to Endnote
Title: | Summary of drilling at Bashi Bazouk MLN 13 February to June 1992 |
Title Holder / Company: | Pine Creek Goldfields |
Report id: | CR1992-0825 |
Tenure: | MLN13 |
Year: | 1992 |
Author: | Fawcett, C |
Abstract: | A programme of RC drilling was undertaken in Bashi Bazouk and Battery Shear during the period February to June 1992. Drilling intersected siltstones, greywacke and grits of the Kohinoor Grit unit. Gold assays intersected were generally spotty with assays ranging from 1.02-8.79 grams per tonne Au. Mineralisation consists of south-easterly dipping vein sets and westerly dipping faults. Old workings follow southerly plunging zones which appear to be the intersecting zone of the vein set with the faults. |
Date Added: | 20-Oct-2014 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
CR19920825.pdf | 2.75 MB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.