Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/78486
Export to Endnote
Title: | Report on drilling at Battery Shear, Cox's and Henry George, MLN 13, September to December 1990, July to October 1991 |
Title Holder / Company: | Pine Creek Goldfields |
Report id: | CR1991-0625 |
Tenure: | MLN13 |
Year: | 1991 |
Author: | Yea, WJA |
Abstract: | Evaluation drilling (diamond, RC and percussion) was carried out during 1990 and 1991, at the Battery Shear, Cox's and Henry George. Results have defined a zone of anomalous mineralisation with very poor grade continuity at Battery Shear, over a strike length of 200m. Mineralisation is related to a prominent easterly dipping shear zone oblique to the Enterprise syncline fold axis which it intersects. A geostatistical study has revealed only low average grades and very low recoverable proportions. Mineralisation however, is closed to the south and results do suggest that grade continuity may improve. At cox's the results defined a well structured resource. Mineralisation is related to an oblique shear zone and found predominantly within easterly dipping quartz veins formed at a high angle to the direction of shearing. A geostatistical study has provided estimates of recoverable tonnes and grade that are encouraging and will provide the basis for a full evaluation and feasibility study of the resource. No significant mineralisation was found at Henry George. |
Date Added: | 8-Sep-2014 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
CR19910625.pdf | 60.34 MB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.