Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/77396
Export to Endnote
Title: | EL 26625 Partial relinquishment report for the period 24 May 2011 to 23 May 2013 |
Title Holder / Company: | ERO Mining |
Report id: | CR2013-0546 |
Tenure: | EL26625 |
Year: | 2013 |
Author: | Parker, F |
Abstract: | During the first 2 years of tenure the only exploration work conducted on surrendered blocks was data compilation. A planned airborne EM and magnetic survey was not able to be carried out due to the inability to find a suitable geophysical contractor. No ground based fieldwork was conducted. |
Date Added: | 28-Oct-2013 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL26625_2013_P.pdf | 720.57 kB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.