Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/76664
Export to Endnote
Title: | Final report EL 23682 Chilling for the period 18 September 2003 to 17 September 2011 |
Title Holder / Company: | Crossland Mines Crossland Uranium Mines |
Report id: | CR2011-0990 |
Tenure: | EL23682 |
Year: | 2011 |
Author: | Melville, PM |
Abstract: | During the term of the licence only basic exploration activities were carried out. The remoteness, lack of access and diffulty of the terrain inhibited systematic ground exploration. In 2009 preliminary planning of a drillhole to test a bullseye magnetic anomaly was investigated. The hole was eventually cancelled. Work carried out during the term of the licence included: literature research and data compilation; helicopter-supported geological reconnaissance and collection of (59) stream sediment samples, 1 rock chip sample and 5 diamond samples; and airborne magnetics and radiomentris. |
Date Added: | 28-Oct-2013 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL23682_2011_AS_01.pdf | 1.37 MB | Add | |
EL23682_2011_AS_02_Appendix1.pdf | 2.39 MB | Add | |
EL23682_2011_AS_03_Appendix1.xls | 307 kB | Microsoft Excel | Add |
EL23682_2011_AS_04_Appendix2.txt | 1.25 kB | Text | Add |
EL23682_2011_AS_05_Appendix2.txt | 23.43 kB | Text | Add |
EL23682_2011_AS_06_Appendix3.pdf | 6.39 MB | Add | |
CR2011-0990_Figures.zip | 5.88 MB | ZIP | Add |
CR2011-0990_Geophysics.zip | 9.86 MB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.