Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/75064
Export to Endnote
Title: Annual Report for EL 25426 Turner's Dome Project 19 March 2008 to 18 March 2009
Title Holder / Company: Yellow Rock Resources
Report id: CR2009-0208
Tenure: EL25426
Year: 2009
Author: Davis, B
Abstract: Exploration work conducted on the Turner's Dome Project during the period ending 21 March 2009 included: geophysical interpretations; geological map analysis; outcrop and access route identification; scintillometer surveys; and rock chip sampling. Interpretation of the recently conducted Airborne Survey by GPX Airborne Services Pty Ltd - (EMI Magnetics and Radiometrics) from the Central Area of the tenement was conducted by Geologica Pty Ltd. Field Visit - involved the 'ground proofing' of geophysical targets from radiometrics on the Central Area. During February 2008 GPX Airborne Services completed a grid survey of airborne magnetics and radiometrics over the lease. This was completed at a line spacing of 100m and a flying height of 60m. A total of approximately 3,318 line kilometres was surveyed and results plotted at 1:25,000 scale. Maps illustrating contoured potassium, thorium, uranium and total radiometric counts as well as Digital Terrain Models (DTM), Total Magnetic Intensity (TMI), Reduced To Pole (RTP) and First Order Derivative (1VD) images were produced for analysis. The image data were modeled at several different shadow angles and in various combinations to allow interpretation of surface and sub-surface structures to be completed.
Date Added: 24-Oct-2013
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL25426_2009_A_01.pdf1.46 MBPDF Add
EL25426_2009_A_02_Interp_Report_Turners.pdf549.8 kBPDF Add
CR2009-0208_Data.zip13.41 kBZIP Add
CR2009-0208_Figures.zip70.3 MBZIP Add
CR2009-0208_Geophysics.zip78.1 MBZIP Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader