Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/74694
Export to Endnote
Title: Final report for EL 23912 Bynoe Project, for the period June 2004 to July 2008
Title Holder / Company: Talison Greenbushes
Report id: CR2008-0563
Tenure: EL23912
Year: 2008
Author: Purvis, AH
Abstract: This report outlines exploration activities carried out on tenement EL 23912 at the Bynoe Project south of Darwin, NT, during the tenure of the tenement from June 2004 to July 2008 when the tenement was surrendered. Lithostructural mapping and geochemical sampling information collected from the exploration tenement by Sons of Gwalia Ltd, the previous owner, during earlier programmes have been collated and reviewed. Site assessments were carried out in late 2005 and mid 2006 to determine options to further exploit the mineral potential of the Bynoe project area. The conclusions are that the existing mineralisation is in small separated pods and the likelihood of significant tonnages of localised mineable grade mineralisation is low. No further work is recommended.
Date Added: 24-Oct-2013
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL23912_2008_S_01.pdf413.89 kBPDF Add
EL23912_2008_S_02_Logs_Assays_BY001-223.xls350.5 kBMicrosoft Excel Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader