Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/68560
Export to Endnote
Title: | Annual report Union Reefs project 04-07-1988 to 03-07-1989 |
Title Holder / Company: | Mineral Horizons Togar |
Report id: | CR1989-0659 |
Tenure: | MCN515; MCN516; MCN518; MCN519; MCN520; MCN521; MCN522; MCN535; MCN536; MCN537; MLN765; MLN774; MCN822; MCN823; MCN824; MCN825; MCN826; MCNA821; MCNA883; MCNA884; MCNA885; MCNA886; MCNA887; MLNA1043; MLNA1044; MLNA1045; MLNA1152; MCN2936; MCN2937; MCN2938; MCN2939; MCN2940; MCN2941; MCN2942; MCN2943; ELA6533 |
Year: | 1989 |
Author: | Mulroney, MG |
Abstract: | The report outlines previous production-exploration in the Union Reefs area, ore reserves at Crosscourse and Ping Quees. In December 1988 Mineral Horizons N L and Togar Pty Ltd commenced gold jig based alluvial production-initial production achieved low recovery rates due to high water flow required to break down clay. The plant has been modified by a bank of Knielson concentrators and a large capacity scrubber trommel. Gold production from the end of June 1989 totalled 149. 7 oz from approximately 15 000 loose cu.m of alluvial material. Structural features reported include: Pine Creek shear zone. |
Date Added: | 23-Oct-2013 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
CR19890659.pdf | 7.18 MB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.