Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/68560
Export to Endnote
Title: Annual report Union Reefs project 04-07-1988 to 03-07-1989
Title Holder / Company: Mineral Horizons
Togar
Report id: CR1989-0659
Tenure: MCN515;  MCN516;  MCN518;  MCN519;  MCN520;  MCN521;  MCN522;  MCN535;  MCN536;  MCN537;  MLN765;  MLN774;  MCN822;  MCN823;  MCN824;  MCN825;  MCN826;  MCNA821;  MCNA883;  MCNA884;  MCNA885;  MCNA886;  MCNA887;  MLNA1043;  MLNA1044;  MLNA1045;  MLNA1152;  MCN2936;  MCN2937;  MCN2938;  MCN2939;  MCN2940;  MCN2941;  MCN2942;  MCN2943;  ELA6533
Year: 1989
Author: Mulroney, MG
Abstract: The report outlines previous production-exploration in the Union Reefs area, ore reserves at Crosscourse and Ping Quees. In December 1988 Mineral Horizons N L and Togar Pty Ltd commenced gold jig based alluvial production-initial production achieved low recovery rates due to high water flow required to break down clay. The plant has been modified by a bank of Knielson concentrators and a large capacity scrubber trommel. Gold production from the end of June 1989 totalled 149. 7 oz from approximately 15 000 loose cu.m of alluvial material. Structural features reported include: Pine Creek shear zone.
Date Added: 23-Oct-2013
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
CR19890659.pdf7.18 MBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader