Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/63829
Export to Endnote
Title: | SEL 8788 - Supplejack project third annual report year ending 4 October 1997 |
Title Holder / Company: | Acacia Resources |
Report id: | CR1997-0767 |
Tenure: | SEL8788 |
Year: | 1997 |
Author: | Tornatora, P |
Abstract: | Angled RAB drilling at Tregony outlined two new zones of mineralisation along strike from the previously outlined zone of mineralisation. To date 3 pods of mineralisation have been outlined over a strike of 1.5km. Maximum strike length of each pod is 300m. RC drilling at Tregony intersected a number of potentially economic intersects including 8m @ 19.09 g-t Au, 6m @ 9.61 g-t Au and 5m @ 6.625 b-t. Mineralisation associated with quartz veining. RAB drilling of the Edwina Shear @ Montague Duck returned 8m @ 71 g-t and 13m @ 0.25 g-t. Results from Edwina were disappointing. |
Date Added: | 23-Oct-2013 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
CR1997-0767_Vol_1.pdf | 14.07 MB | Add | |
CR1997-0767_Vol_2.pdf | 10.29 MB | Add | |
CR1997-0767_Vol_3.pdf | 11.68 MB | Add | |
CR1997-0767_Vol_4.pdf | 11.37 MB | Add | |
CR1997-0767_Data.zip | 217.11 kB | Unknown | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.