Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/60929
Export to Endnote
Title: Annual Report for EL 2067 the period 11-06-1981 to 10-06-1982.
Title Holder / Company: Adelaide Brighton Cement
Report id: CR1982-0215
Tenure: EL2067
Year: 1982
Author: Nixon, LGB
Abstract: EL 2067 is held to explore for limestone. The target specification for quicklime manufacture is less than 4% MgO. For cement manufacture, the grade can be as low as 78% calcium carbonate but the magnesia must be under 2.5% and preferably less than 2%. 40 holes for 389 m were drilled at two prospects. A number of lithofacies have been recognised. One of these is suitable for cement manufacture, but marginal for lime. More work is needed to test this deposit. Lime burning tests were done in Germany, Switzerland, and Victoria.
Date Added: 23-Oct-2013
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
CR19820215.pdf3.4 MBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader