Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/94857
Export to Endnote
Title: ML 29960 Annual Technical Report 24 June 2018 to 23 June 2019
Title Holder / Company: Casey, RT
Casey, JL
Report id: CR2019-0276
Tenure: ML29960
Year: 2019
Author: Casey, PRE
Abstract: During the reporting period, 5 trips were taken to the lease site, for the purpose of camp maintenance and lease exploration. Minor vegetation maintenance by hand was conducted to re-establish old vehicle tracks to access more of the lease. Burning off around the camp site has been conducted on two occasions to ensure the camp is not compromised due to grass fires. Both the wet season and habitation of salt water crocodiles continue to limit access to the lease during certain parts of the year. Areas identified during previous reporting period in which rock sampling was to take place has not been done as predicted during this reporting period. It is expected that this will occur during the now current field season.
Date Added: 8-Sep-2026
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
ML29960_2019_A.pdf110.16 kBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader