Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/94596
Export to Endnote
Title: EL 28041 Renner Springs Project Annual Technical Report Year 9, 9th December 2018 to 8th December 2019
Title Holder / Company: OM Manganese
Report id: CR2019-0646
Tenure: EL28041
Year: 2020
Author: Reddell, CT
Abstract: Exploration activity on EL 28041 during Year 9 was limited to the drilling of 3 short diamond holes (71.6m) in the Renner West deposit to provide core for metallurgical test work. The core has been selectively cut and assayed, and composite samples have been put aside for metallurgical test work but are yet to be tested. The start of the planned 2019 drill program was delayed by an extended wait in approval of the 2019 Bootu Creek Exploration MMP, submitted in May 2019 and eventually approved in October 2019. Subsequent availability of a suitable multipurpose drill rig and competing demands for Geotechnical core drilling at Bootu Creek delayed the start of the program until late October 2019. The planned RC component on the Renner Central prospect was deferred in preference of initial RC drill testing on the nearby Carruthers North prospect on EL 28604.
Date Added: 24-Mar-2026
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL28041_2019_A_01.pdf920.99 kBPDF Add
EL28041_2019_A_02_collars.txt1.75 kBText Add
EL28041_2019_A_03_dhgeochem.txt9.12 kBText Add
EL28041_2019_A_04_geol_logs.txt8.4 kBText Add
EL28041_2019_A_05_logging_codes.txt2.35 kBText Add
EL28041_2019_A_06_MRT_AlternativeTemplate.txt7.11 kBText Add
EL28041_2019_A_07_RSDD001cr.xls80.5 kBMicrosoft Excel Add
EL28041_2019_A_08_RSDD002cr.xls79 kBMicrosoft Excel Add
EL28041_2019_A_09_RSDD003cr.xls77.5 kBMicrosoft Excel Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader