Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/94570
Export to Endnote
Title: Group Technical Report GR159-10, MLN 2, 3, 951, 952, 953, 956, 957, 958, 959, 960, 961 and ML 31219 and ML 31220 for the period 1 July 2018 to 30 June 2019
Title Holder / Company: Groote Eylandt Mining Company
South32
Report id: CR2019-0411
Tenure: MLN2;  MLN3;  MLN951;  MLN952;  MLN953;  MLN956;  MLN957;  MLN958;  MLN959;  MLN960;  MLN961;  ML31219;  ML31220
Year: 2019
Author: Page, T
Abstract: Various RC drilling programs were successfully carried out this year to improve the confidence of the resource model, and to include additional potential resource along the fringes. Furthermore, close space drilling has been successful in improving the resolution of the ore horizon for short term planning. The 2019/20 drill program will focus on additional RC infill drilling in areas of increased complexity, and in areas along the fringes of the resource in order to improve the confidence in areas outlined in the current 5 to 8 year mine plan footprint. Regional drilling is planned for the south and western parts of the mining leases in order to improve confidence and add additional resource in areas of sparse drill coverage. A diamond drilling program is planned for 2019/20 to update current geometallurgical assumptions in the resource and grade control models. Follow up GPR surveys are planned when conditions are more favourable to test the suitability of the method to defining continuity of the ore horizon, and to test the validity of historic edge of ore boundaries. Subsequent resource model updates will include all new data received during the next drilling season. The model will include additional stratigraphic horizons above and below the main horizons based on a revised assessment of potential economic extraction potential.
NOTEAdditional data available on request
Date Added: 23-Mar-2026
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
GR159_2019_GA.pdf5.43 MBPDF Add
CR2019-0411_Appendix_A_-_Drilling_Data.zip1.32 MBZIP Add
CR2019-0411_Appendix_C_-_LiDAR_Survey_Data.zip287.84 MBZIP Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader