Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/94558Export to Endnote
| Title: | Mount Todd Project Combined Annual Report GR087 for the period ended 14 March 2019 |
| Title Holder / Company: | Vista Gold Australia |
| Report id: | CR2019-0262 |
| Tenure: | EL29882; EL29886; EL28321; EL30898 |
| Year: | 2019 |
| Author: | Harris, P |
| Abstract: | EL's 29882, 29886, 28321 and EL 30898 are situated approximately 40 km east of the town of Pine Creek. This annual report documents the work completed on the licences for the period from 15 March 2017 to 14 March 2018. ELs 29882 and 29886 as they stand are the result of a consolidation and spilt of EL 25576, EL 25670, EL 25668 and EL 25669 which occurred on the 16/09/2013. EL 28321 and EL 30898 were added into this Group Reporting in May 2016 after the grant of EL 30898. Vista Gold Australia Pty Ltd. is the sole operator and manager of the exploration work. Drilling of 2 diamond holes at the Wandie IP project, under the Geoscience Collaborations Initiative was carried out as well as one shallow hole on the Goldeneye prospect, 103 rock chip samples and 231 infill soils at Wandie during the reporting year. |
| Date Added: | 23-Mar-2026 |
| Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
| File | Size | Format | Add to Download |
|---|---|---|---|
| GR087_2019_GA.pdf | 1.54 MB | Add | |
| CR2019-0262_Appendix1.zip | 1.72 MB | ZIP | Add |
| CR2019-0262_Appendix2.zip | 42.48 MB | ZIP | Add |
| CR2019-0262_Data.zip | 255.12 kB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.