Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/94506Export to Endnote
| Title: | Nabarlek ML Project MLN 962 Annual Technical Report for the period 23 March 2018 to 22 March 2019 |
| Title Holder / Company: | Queensland Mines DevEx |
| Report id: | CR2019-0178 |
| Tenure: | MLN962 |
| Year: | 2019 |
| Author: | Greene, D |
| Abstract: | During the reporting period a 3-dimensional IP survey was completed over the Nabarlek Uranium Mine to map extensions to alteration and sulphides associated with uranium mineralisation, resulting in the definition of a chargeability anomaly located beneath the historical open pit. The anomaly is located beneath the Oenpelli Dolerite and is interpreted to be a deflected extension of the North Fault, which was a controlling feature of the Nabarlek deposit and the position where highest grades were recorded. The extension of this crucial feature has not yet been located beneath the Oenpelli Dolerite with drilling largely having targeted to the north. This exciting target will be drill tested in the upcoming reporting period. |
| Date Added: | 18-Mar-2026 |
| Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
| File | Size | Format | Add to Download |
|---|---|---|---|
| MLN962_2019_A_Report.pdf | 4.75 MB | Add | |
| CR2019-0178_Geophysics.zip | 36.84 MB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.