Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/94415
Export to Endnote
Title: EL 31937 Illogwa Project Annual Report for the period 2 January 2020 to 1 January 2021
Title Holder / Company: Typhon Minerals
Report id: CR2021-0022
Tenure: EL31937
Year: 2021
Abstract: EL 31937 (Project) is located approximately 145km ENE of Alice Springs. The Project is located north of the Basil Cu-Co deposit (on EL 26942), and west of the important Ni-Cu-PGE prospects at Blackadder and Baldrick. Typhon is assessing the potential of the Project for Basil-style Cu-Co sulphide deposits, Ni-Cu-PGE sulphide mineralisation associated with mafic and ultramafic intrusions, as well as bedrock and alluvial Au deposits. Previous exploration and mineral development activities in the general Project area have highlighted several Cu-Co and Ni-Cu-PGE anomalies. During the reporting period, Typhon compiled and historical geological, geophysical, remote sensing and exploration work undertaken over the Project area. Geological reconnaissance and field checking has also been undertaken. Given the proximity of the Project to the Basil Deposit, Typhon offered to purchase a 100% interest in EL 26942. It is anticipated that Typhon will take full ownership of EL 26942 during the first quarter of 2021. The amalgamation of EL 26942 with Typhon's tenements will mean that the exploration potential of the Project will be maximised as Typhon will be able to gain an in depth understanding of geological units hosting the mineralisation on EL 26942. The potential for the Project area to contain economic mineralisation appears to be good, and further exploration assessment work is warranted.
Date Added: 25-Nov-2025
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL31937_2021_A.pdf1.06 MBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader