Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/94412
Export to Endnote
Title: EL 31543 Illogwa Project Annual Report for the period 2 January 2022 to 1 January 2023
Title Holder / Company: Typhon Minerals
Report id: CR2023-0016
Tenure: EL31543
Year: 2023
Abstract: EL 31543 (Project) is located approximately approximately 145km ENE of Alice Springs and comprises three separate areas. The central and western areas of the Project adjoin EL 26942, which is registered to Mithril Resources Pty Ltd, and covers the Basil Cu-Co deposit, as well as a number of important Cu-Co and Ni-Cu-PGE prospects, such as Manuel, Miggins, Bob and Hammerhead. Typhon is assessing the Project for Basil-style Cu-Co sulphide deposits, Ni-Cu-PGE sulphide mineralisation associated with mafic and ultramafic intrusions, as well as alluvial Au deposits. Previous exploration and mineral development activities in the general Project area have highlighted several Cu-Co and Ni-Cu-PGE anomalies. The rugged terrain at Mt Ruby in the far western portion of the Project contains a number of untested high-priority VTEM conductivity anomalies, as well as anomalous rock chip samples associated with compositionally layered sequences of the Riddock Amphibolite. The potential for the Project area to contain economic mineralisation appears to be good, and further exploration assessment work is warranted.
Date Added: 25-Nov-2025
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL31543_2023_A.pdf4.1 MBPDF Add
CR2023-0016_GIS_FILES_EL31543.zip13.47 MBZIP Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader