Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/94320
Export to Endnote
Title: | EL 31692 Leila Creek Project Annual Report for the period 21 September 2021 to 20 September 2022 |
Title Holder / Company: | Cerberus Resources |
Report id: | CR2022-0471 |
Tenure: | EL31692 |
Year: | 2022 |
Abstract: | EL 31692 (Project) is located approximately 75km SW of Borroloola. Cerberus is assessing the potential of the Project for Stratiform, sediment-hosted Pb-Zn-Ag (+/- Cu) deposits. Previous exploration and mineral development activities in the Project area have highlighted several geological and geophysical anomalies. The northeastern portion of the Project area offers the most realistic exploration opportunity to locate a large base-metal deposit beneath rocks of the Lynott Depositional Cycle, in structural contact with Tawalla Group basement. A total of 22 sub-blocks were relinquished from the Project during 2022, leaving 9 retained sub-blocks. |
Date Added: | 12-Sep-2025 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL31692_2022_A.pdf | 1.65 MB | Add | |
CR2022-0471_Appendix_1_GIS.zip | 4.63 MB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.