Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/94294
Export to Endnote
Title: | Lamont Pass Project Annual Report For the Period 3rd August 2022 to 2nd August 2023 EL 32175 |
Title Holder / Company: | Teck Australia |
Report id: | CR2023-0452 |
Tenure: | EL32175 |
Year: | 2023 |
Author: | Mander, J |
Abstract: | The Lamont Pass Project Area is situated within the prospective Batten Fault Zone of the McArthur Basin, with the primary exploration target being massive sulphide hosted zinc-lead-silver deposits of the McArthur Group. EL 32175 covers an area of 470 km2 and is contiguous to the southern end of the Teck operated Reward licenses. Teck Australia Pty Ltd acquired the Lamont Pass licence EL 32175 on the 3rd of August 2020 and has been the sole operator and tenure holder since then. During this reporting period work completed included executing a helicopter based reconnaissance survey, geochemical analysis and review of some of soil samples taken during the helicopter reconnaissance, and a historic core review in Darwin. |
Date Added: | 12-Sep-2025 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL32175_2023_A.pdf | 3.7 MB | Add | |
CR2023-0452_Data.zip | 954.56 kB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.