Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/94102
Export to Endnote
Title: Talbot North Project EL 27806 Annual Technical Report for the period 14 July 2017 to 13 July 2018
Title Holder / Company: Tychean Resources
Ramelius Resources
Report id: CR2018-0534
Tenure: EL27806
Year: 2018
Author: van Noort, E
Abstract: This annual and final report discusses exploration activities on EL 27806, located c. 610km north-west of Alice Springs, Northern Territory, for the period of tenure, covering the period 14th July 2010 to 16th November 2018. During 2014, Ramelius Resources Ltd entered into a Farm-in Agreement with Tychean Resources Limited, comprising the Tanami Joint Venture, which includes EL 27806. Ramelius are operators of the project and have earned an 85% Joint Venture Interest in the tenement package. Work completed on the tenement during the period of tenure comprised: Historical data review and target generation; Geological reconnaissance and rock-chip sampling; Drill planning. No exploration was completed during the final period of tenure (14/7/2018 to 16/11/2018). The tenement was surrendered on 16th November, 2018.
Date Added: 27-Jul-2025
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL27806_2018_S_01_ReportBody.pdf2.44 MBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader