Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/93933
Export to Endnote
Title: Annual Report for Wandie Project ML 29909 for period 4 June 2017 to 3 June 2018
Title Holder / Company: Mineral Contracting Australia
Report id: CR2018-0265
Tenure: ML29909
Year: 2018
Author: Hardie, C
Abstract: Mineral Contracting Australia Pty Ltd (MCA) acquired ML 29909 during the reporting period. An Instrument of Dealing - Transfer was registered on 6 March 2018. MCA plans to process low grade mineralised stockpiles and re-process tailings from previous alluvial processing operations on the Wandie Project (ML 29909) and Saunders Rush Project (ML 29915). A Mine Management Plan (MMP) was approved on 5 July 2018. During the reporting period numerous site visits have been conducted on ML 29909 and ML 29915 with geologists, metallurgists, environmentalists and various other contractors to assist in compiling the required data for the MMP and for planning purposes for the processing plant and activities.
Date Added: 13-Jul-2025
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
ML29909_2018_A.pdf1.61 MBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader