Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/93776
Export to Endnote
Title: EL 32518 Aladdin Project Final Report 11 October 2021 to 10 October 2024
Title Holder / Company: Future Energy Minerals
Report id: CR2024-0624
Tenure: EL32518
Year: 2024
Abstract: Mineral Exploration License (EL) 32518 was granted to Santonian Resources Ltd on 11th October 2021 for a term of 6 years and transferred to Mr. Aaron Banks on 7th December 2022 and subsequently transferred to Future Energy Minerals on 03 September 2024. EL 32518 forms part of the Aladdin Project which stretches for a ENE strike of 200km and is centred on the settlement of Top Springs and 240km South from Katherine. Historically the area has been suspected to have bornite mineralisation due to iridescent stains found within the laterite. Geochemical assays of rock chip samples recovered from the project area has shown high anomalous Vanadium, Titanium, Iron and Aluminium content within the surficial mineralised laterite. Preliminary office studies have shown that the suspected mineralised laterite extends further North. Exploration of the Aladdin Project Area and consequently EL 32518 recovered reasonable vanadium results from rock chip sampling suggesting a possible underlying Titanium / Magnetite / Vanadium / mafic intrusive from the tenure in the Project. Remote sensing techniques using the ASTER Ferric Oxide map and DTM elevation map suggest that iron oxides are present. Following the completion of this preliminary work as detailed in the past reports, Future Energy Minerals Ltd concluded that the potential for economic mineralisation/deposits was very low and therefore the title was surrender with a cessation date of 10 October 2024.
Date Added: 30-Jun-2025
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL32518_2024_AS.pdf975.05 kBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader