Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/93747
Export to Endnote
Title: GR543 The Aladdin Project Group Annual Report for the period 11 April 2021 to 10 April 2022
Title Holder / Company: Santonian Resources
Holdfast Exploration
Report id: CR2022-0305
Tenure: EL31967;  EL31971
Year: 2022
Abstract: EL 31971 and EL 31967 were granted to Santonian Resources Ltd, a 100% wholly owned subsidiary of Holdfast, on 11th April 2019 by the Department of Primary Industries and Resources now known as the Department of Industry, Tourism and Trade, and now form part of Combined Reporting GR543. A continuation reconnaissance RAB drilling program resulted in a lower-than-expected Vanadium and Titanium grade in comparison to the initial rock chip sampling. However, an anomalous grade of Yttrium was intercepted at VA-23 resulting in a REO + Y2O3 at 0.14% at the 19m interval. Further exploration work is required to determine where an economic grade of Vanadium and Titanium is concentrated within the tenure. In addition, follow up diamond drilling is required to determine what mineral is hosting the REE anomaly.
Date Added: 30-Jun-2025
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
GR543_2022_GA_03_DrillCollars.txt3.14 kBText Add
GR543_2022_GA_01_Report.pdf916.62 kBPDF Add
GR543_2022_GA_02_DownholeGeochem.txt75.98 kBText Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader