Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/93737
Export to Endnote
Title: | First Annual Report for EL 31971 The Aladdin Project 11 April 2019 to 10 April 2020 |
Title Holder / Company: | Santonian Resources Holdfast Exploration |
Report id: | CR2020-0176 |
Tenure: | EL31971 |
Year: | 2020 |
Abstract: | EL 31971 was granted to Santonian Resources Pty Ltd on 11th April 2019 for a term of 6 years. The Aladdin Project is located 40 km South East of the settlement of Top Springs and 240km South from Katherine. Historically the area has been suspected to have bornite mineralisation due to iridescent stains found within the laterite. Recent field trips conducted by Santonian Resources have found that the erroneous reports are mineralised laterite that comprises of high anomalous Vanadium, Iron, Titanium and Aluminium content. Furthermore, metallurgical studies have also shown that the mineralisation can be economically processed through leaching and magnetic separation processes. Findings from the year 1 reporting period warrant further exploration via a drilling programme to obtain a high level of accuracy of the extent of the mineralisation. |
Date Added: | 30-Jun-2025 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL31971_2020_A.pdf | 5.17 MB | Add | |
CR2020-0176_Data.zip | 12.46 kB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.