Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/93631
Export to Endnote
Title: | EL 32845 West Nolan's Bore Lithium Project Partial Relinquishment Report for the period 5 April 2023 to 4 April 2024 |
Title Holder / Company: | Pegmatite One |
Report id: | CR2024-0395 |
Tenure: | EL32845 |
Year: | 2024 |
Author: | Hills, Q |
Abstract: | This report describes exploration activity conducted over the partially relinquished portion of EL 32845 during the reporting period from 5 April 2022 to 4 April 2024. EL 32845 is one of 17 ELs (reduced from 21 ELs) that make up the Pegmatite One's Northern Territory tenure package. EL 32845 is part of GR625 - West Nolan's Bore Lithium Project, with EL 32844, EL 32846, EL 32851 and EL 32852. EL 32845 originally covered 250 blocks for 789.39 km2 but was reduced to 123 blocks for 387.21 km2, prior to its second anniversary date (04/04/2024). The area has a history of tin prospectivity. Target minerals are lithium, tin and tantalum. During the reporting period, 9 rockchip samples were taken within the area of EL 32845 that was relinquished. None of these rockchip results were considered anomalous for lithium, tin and tantalum. However, there was some minor REE anomalism. Due to the lack of lithium, tin and tantalum anomalism, this area was relinquished as a part of a tenure rationalisation exercise due to the need to reduce costs. |
Date Added: | 18-Mar-2025 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL32845_2024_P_01.pdf | 1.4 MB | Add | |
EL32845_2024_P_02_NTSG4_SURF2024A.txt | 8.82 kB | Text | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.