Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/93579
Export to Endnote
Title: | Mount Doreen 2024 Geophysics and Drilling Collaborations Program Final Report |
Title Holder / Company: | Litchfield Minerals |
Report id: | CR2024-0722 |
Tenure: | EL31305 |
Year: | 2024 |
Author: | Dow, R |
Abstract: | The Mt Doreen Geophysics and Drilling Collaborations project comprised drilling three holes (LMRC005, LMRC006, LMRD008 for 561.2m) to test Pole-Dipole and Gradient Array Induced Polarization chargeability anomalies surrounding the peripheries of the Silver King (Pb-Zn-Cu-Ag) and Wolfram Hill (W-Cu-Ag) prospects. The key object of the program was to expand the mineralized footprint of these known systems to demonstrate scale suitable for potential economic extraction. The program started on 29th May, 2024 with the drilling of LMRC005 at Copper Flats (Wolfram Hill north) and concluded on 20th June, 2024 with the completion of LMRD008 at the Silver King prospect. Two 150m, RC-only holes were completed at Copper Flats (LMRC005, LMRC006) and a single diamond hole with an RC pre-collar was drilled at Silver King (LMRD008, 261.2m). All holes were logged geologically and were geochemically assayed in their entirety. Drilling at both prospects intersected unaltered/unmineralized Lander Rock Formation, effectively sterilizing the northern periphery of the two prospects. |
NOTE: | Report includes RC holes and data that were not co-funded as they commenced drilling before 1 Jun 2024, but included in the project area. |
Date Added: | 17-Mar-2025 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL31305_2024_C_FinalReport.pdf | 1.79 MB | Add | |
CR2024-0722_Data.zip | 1.61 MB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.