Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/93254
Export to Endnote
Title: | MLN 1121 Annual Technical Report 5 January 2016 to 4 January 2017 |
Title Holder / Company: | Mount Isa Mines McArthur River Mining |
Report id: | CR2017-0008 |
Tenure: | MLN1121 |
Year: | 2017 |
Author: | Morris, E |
Abstract: | During the reporting period a drilling campaign was completed across the whole MRM site. The aims for the project were: To better determine the groundwater flow around site; Waste characterisation of near surface rock around the TSF and; Installation of vibrating piezometers and associated Packer Testing. One diamond drill hole, totalling 88.4 metres, was completed within MLN 1121 which was drilled for geotechnical and hydrogeological analysis. The hole intersected a major fault structure, the Woyzbun Fault, at 37 metres which has allowed more accurate modelling of the structure. |
Date Added: | 5-Nov-2024 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
Geology_Logs.txt | 11.44 kB | Text | Add |
MLN1121_2017_A.pdf | 1.17 MB | Add | |
MLN1121_2017_A_01_DrillCollars.txt | 1.97 kB | Text | Add |
CR2017-0008_MLN1121_2017_A_02_Downhole_Survey.txt | 2.12 kB | Text | Add |
MLN1121_2017_A_03_Lithologs.txt | 4.33 kB | Text | Add |
MLN1121_2017_A_04_DownholeGeochem.txt | 106.08 kB | Text | Add |
MLN1121_2017_A_05_Filelisting.txt | 1.09 kB | Text | Add |
MLN1121_2017_A_06_QAQCGeochem.txt | 7.55 kB | Text | Add |
MRM_SPS_EIS_Drilling_2016_Start_End_Dates_CHY_20170216.xlsx | 8.12 kB | Microsoft Excel XML | Add |
~$MRM2014-Data.xlsx | 165 B | Microsoft Excel XML | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.