Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/93254
Export to Endnote
Title: MLN 1121 Annual Technical Report 5 January 2016 to 4 January 2017
Title Holder / Company: Mount Isa Mines
McArthur River Mining
Report id: CR2017-0008
Tenure: MLN1121
Year: 2017
Author: Morris, E
Abstract: During the reporting period a drilling campaign was completed across the whole MRM site. The aims for the project were: To better determine the groundwater flow around site; Waste characterisation of near surface rock around the TSF and; Installation of vibrating piezometers and associated Packer Testing. One diamond drill hole, totalling 88.4 metres, was completed within MLN 1121 which was drilled for geotechnical and hydrogeological analysis. The hole intersected a major fault structure, the Woyzbun Fault, at 37 metres which has allowed more accurate modelling of the structure.
Date Added: 5-Nov-2024
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
Geology_Logs.txt11.44 kBText Add
MLN1121_2017_A.pdf1.17 MBPDF Add
MLN1121_2017_A_01_DrillCollars.txt1.97 kBText Add
CR2017-0008_MLN1121_2017_A_02_Downhole_Survey.txt2.12 kBText Add
MLN1121_2017_A_03_Lithologs.txt4.33 kBText Add
MLN1121_2017_A_04_DownholeGeochem.txt106.08 kBText Add
MLN1121_2017_A_05_Filelisting.txt1.09 kBText Add
MLN1121_2017_A_06_QAQCGeochem.txt7.55 kBText Add
MRM_SPS_EIS_Drilling_2016_Start_End_Dates_CHY_20170216.xlsx8.12 kBMicrosoft Excel XML Add
~$MRM2014-Data.xlsx165 BMicrosoft Excel XML Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader