Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/93243
Export to Endnote
Title: Annual Report EL 22349 Mount Sainthill 17 May 2015 to 16 May 2016
Title Holder / Company: Thor Mining
Molyhil Mining
Report id: CR2016-0341
Tenure: EL22349
Year: 2016
Author: Bradey, R
Abstract: This annual exploration report covers EL 22349 for the period 17 May 2014 to 16 May 2015. EL 22349 comprises 118 graticule blocks and includes ML 23825, over the Molyhil tungsten, molybdenum deposit. Further tungsten resources are being sought to supplement a proposed mining and treatment operation at Molyhil. Prospective geological settings are likely to exist blanketed under transported cover in the vicinity of the deposit. Planning, design and permitting of a bedrock geochemistry program has been completed to test identified targets. Although no on-ground exploration work was carried out during the reporting period, over $320,000 was spent by Thor Mining on metallurgical test work, feasibility and permitting on the Molyhil Project which lies within EL 22349 (report included). The company is actively seeking funding to resume planned exploration activities.
Date Added: 5-Nov-2024
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL22349_2016_A.pdf1.05 MBPDF Add
EL22349_2016_A_metallurgical_testwork.pdf10.43 MBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader